Advanced Planning では、SAP S/4HANA Cloud Private Edition のマスターデータを使用します。どのデータ オブジェクトに Advanced Planning フラグを設定できますか? 注: この質問には 2 つの正解があります。
正解:A,D
In SAP S/4HANA Cloud Private Edition, Advanced Planning (PP/DS) integrates with core master data, and the "Advanced Planning" flag activates PP/DS-specific planning. This flag can be set in:
* Work center(A): In the work center (transaction CR02, Basic Data tab, field: Advanced Planning), checking this flag (or integrating with a resource in APO/PP/DS) enables detailed scheduling and capacity planning in PP/DS. It designates the work center as a resource for finite scheduling (e.g., in
/SAPAPO/RES01).
* Material(D): In the material master (MM02, Advanced Planning tab, field: PP/DS Planning), activating this flag makes the material relevant for PP/DS planning. It enables features like detailed scheduling, heuristics, and integration with APO or embedded PP/DS functionalities.
Plant(B) doesn't have an Advanced Planning flag-PP/DS activation is at the system or object level (e.g., via CIF integration model), not plant-specific.Production version(C) (MRP 4 view) links BOMs and routings but lacks a specific PP/DS flag-its relevance comes from the material and work center settings. This is per SAP' s PP/DS master data setup.