When performing a business impact analysis (BIA), it is the responsibility of the business continuity coordinator to determine the initial recovery time objective (RTO). The RTO is a critical component of the BIA and should be determined in cooperation with the information owners. The RTO should reflect the maximum tolerable period of disruption (MTPD) and should be used to guide the development of the recovery strategy.