b). Constructing the secondary site in a geographically disperse location would ensure that a natural disaster at the primary site would not affect the secondary site. It would also allow for failover during traffic surge situations by distributing the load across different regions. D. Installing generators would provide protection against power surges and outages by providing backup power sources in case of a failure. Generators are part of the physical security requirements for data centers as they ensure availability and resilience. Reference: 1 CompTIA Security+ Certification Exam Objectives, page 8, Domain 2.0: Architecture and Design, Objective 2.1: Explain the importance of secure staging deployment concepts 2 CompTIA Security+ Certification Exam Objectives, page 9, Domain 2.0: Architecture and Design, Objective 2.3: Summarize secure application development, deployment, and automation concepts 3 CompTIA Security+ Certification Exam Objectives, page 11, Domain 2.0: Architecture and Design, Objective 2.5: Explain the importance of physical security controls